Case 2: a Guest APP wants to integrate with VConnect to wallet keys
Example: DUVE
SCOPE
The solution
- Wallet keys.
- Plastic Keys (if needed, integration PMS <> needed).
- Guest APP and PMS are integrated.
- Integration between Guest APP and VConnect needed.
- The hotel needs to authenticate in Apple / Google
- Connectors:
- Vostio 10
- Public API Reservations
- VConnect Core.

Guest APP <> VConnect Integration
Guest APP > VConncect
- Reservation info (create, update, checkin, checkout, move)
- Create key command for Apple and Google
VConnect > Guest APP
- Answer a “Create key command”.
INTEGRATION FLOW AND INFO
STAGE | SUBSTAGE | DESCRIPTION | COMMENTS | MORE INFO |
Request | Register request | All requests must be registered in Assa Abloy’s Service Now Platform, with all the information required in Service Now. | The char people is not using Service Now yet. | (soon link) |
Onboarding | Validate the solution and integration scope by arranging a brief meeting with the third party, or, if that’s not possible, by sending them the onboarding documentation. | Pending Gari (we have the diagrama above so far) | ||
DNA | Send the NDA for signature and ensure it is signed by both parties. | Pending Gari | ||
Share API and Development | Share VConnect Public API | Send the API documentation to the third party. | Pending Gari | |
Share Postman | Send postman… | Pending Gari | ||
Create Sandbox | Create a testing suscription in VConnect: * DEV environment * Connector: Public API * Connector: Vostio 10 (real or Dummy) | |||
Apple / Google validation | Certificate… | Pending to talk with Kevin | ||
Final validation | Validate all the use flow. | Pending Gari | ||
Production | Deploy connector in UAT and PRO | char DevOps team will deploy the new connector in UAT and PRO environments. That means that after de integration, we will need about two weeks to have the integration ready to use in an hotel. | ||
Marketing | Add to char Marketplace | Add the system to char Marketpace | ||
More actions | * Linkedin. * Newsletter. |